The business problem

Finance knew that certain projects on one revenue account were swept to net zero. They did not know how the model chose those projects, or how to add and remove projects each year. Each change needed outside help.

Existing architecture

We traced the sweep from end to end and found five parts.

A mapping sheet lists the eligible combinations of project, account and fund.

A data source joins income statement actuals to that sheet, and a SQL column skips any row whose project is not on the list.

Loaders write trigger values for eligible projects; clearing stale triggers depends on the replace setting of each loader.

A task runs those loaders together.

A formula runs the sweep only where the trigger has a value.

Why it happened

Nothing was broken. The design was not documented, so the single control point, the mapping sheet, was not visible to the people who needed it.

We also found a second, separate sweep on the same account. It is controlled by an attribute on the project dimension and needs no loader. That explained why some projects moved without appearing on the mapping sheet.

Design decision

We changed no formula, integration or dimension. We documented the control points and wrote the add and remove steps for finance.

Implementation approach

  1. To add a project, update the approved project/account/fund mapping, run the trigger task and verify the expected trigger intersection.
  2. To remove a project, remove its mapping and rerun the applicable task. Check whether the specific loader mode clears old trigger data; do not assume that behaviour is the same in every version.
  3. Validate the sweep formula and relevant project/dimension attributes independently, including any second sweep mechanism.

Controls and validation

We traced the mapping, data source, loader and formula, and exercised add/remove scenarios in the sandbox. The actuals trigger behaviour was reviewed. The budget loader had a different replace setting, so budget trigger clearing could not be assumed from the actuals test and required its own configuration check.

Outcome

We delivered an understandable maintenance procedure and identified the separate dimension-attribute mechanism. We documented the budget-trigger clearing gap as a follow-up item.

Lessons learned

Scope of the outcome

Sweep logic documented and selected sandbox checks performed; budget-trigger clearing needs separate configuration.


EPMLogic | Implementation insight based on an anonymized scenario. Exact operational amounts and client details are intentionally omitted.

Workday Adaptive Planning
Related Insights

More from the architecture desk.

Finding Why a Workday Adaptive Planning Elimination Posted to the Wrong Fund
Case Studies

Finding Why a Workday Adaptive Planning Elimination Posted to the Wrong Fund

Platform: Workday Adaptive Planning Scope: internal allocation eliminations in a fund-based planning model The business problem...

Read more
Reconciling Gross Expense Actuals in Workday Adaptive Planning: Scope, Mapping and Currency
Case Studies

Reconciling Gross Expense Actuals in Workday Adaptive Planning: Scope, Mapping and Currency

Platform: Workday Financial Management and Workday Adaptive Planning Scope: gross expense actuals loaded into an expense...

Read more
Planning a Safe Workday Source Change for Personnel Planning
Case Studies

Planning a Safe Workday Source Change for Personnel Planning

Platform: Two Workday tenants and Workday Adaptive Planning Scope: The worker and compensation feed into a...

Read more